
EN_installation manual_Toro_v1.6
- 5 -
1.
Install the 230V ground cable at the master
goal. Make sure it is powered on a separate
power group and has 2m extra length above
ground.
2.
Lay the casing tubes from the basic goals to
the master goal, as shown in the illustration.
Preform the bends with an minimum radius of
1m.
3 Cables
13,66
13,06
Master goal
(placed in red section)