
EN_installation manual_Toro_v1.6
- 16 -
2.
Dig the holes for each anchor of the
four goals: 70cm deep and at least
100x20cm wide. Make sure the power
connection is located in the right place
for the master post.
907
650
1650
9 Mounting: In ground
1.
Remove the tiles as shown in the figure
below. This figure is an example with tiles of
30x30 cm.
1650
806,50
300
Ground
Concrete
Concrete
1650
806,50
300
100
30
20
70
Bottom view
Concrete edging
stones
Top view
Concrete edging
stones