EN_installation manual_Toro_v1.6
- 17 -
Figure 1
3.
Lift the goal by the crane hooks out of the truck. We
recommend using a forklift or a crane with forks. Only
with use of a forklift beam, as shown in figure 1.
4.
Fill the holes with at least 30cm concrete.
Ground cable
Data + power
cables
Data + power
cables
Ground level
Ground level
90
90
Ground cable
5.
Place the goal very slowly in the right
position above the ground.
6.
Place the goal at his position. Carefully lower
above the cables., make sure no cables get
stuck. Repeat these steps for the other goals.