Table 2. Maintenance Schedule (See Figure 10) (Continued)
Item
No.
Item
8 Hr/
1 day
5
350 Hr/
2 month
5
2000 Hr/
1 year
5
Procedure or
Quantity
Specification
1
ISO VG 46 or equivalent.
2
Exxon Univis HVI 26 or equivalent.
3
For freezer or cold storage operation, MIL-G-7711A.
4
With rated load.
5
Whichever comes first.
6
Hydraulic oil changed at initial 350 hour interval.
7
Equalization Charge approximately each month but not more than each week.
8
Multipurpose Grease with 2-4% Molybdenum Disulfate for normal operations.
X=Check C=Change L=Lubricate
NOTE: Never use steam to clean electrical parts.
Maintenance Schedule
52
Содержание A245
Страница 13: ...Figure 4 Warning and Safety Labels Model Description 11 ...
Страница 15: ...Instruments and Controls Figure 5 Instruments and Controls Model Description 13 ...
Страница 50: ...Figure 9 Putting the Lift Truck on Blocks Maintenance Schedule Maintenance Schedule 48 ...
Страница 51: ...Figure 10 Maintenance Points Maintenance Schedule 49 ...
Страница 63: ...1 LED 2 LABEL Figure 14 Charger LED s Maintenance 61 ...
Страница 69: ...1 CRANE 2 SPREADER BAR 3 INSULATOR STRAPS 4 BATTERY Figure 17 Changing the Battery Maintenance 67 ...
Страница 70: ...Figure 18 Battery Compartment Maintenance 68 ...
Страница 74: ...NOTES 72 ...
Страница 75: ...Spacer 3 19 2 19 7 18 5 16 1 16 5 14 12 13 ...