AquaBoost duplex
1
8
2
3
4
7
6
10
5
9
Typical field piping arrangement for the AquaBoost Advanced duplex pumping package.
1. 1/4 in. tap on the suction manifold for low-suction pressure switch
2. Optional tank
3. Discharge gauge
4. Vibration eliminator
5. Anchor the pipe securely if vibration eliminators are used.
6. If a bypass line is installed, then this valve must be kept closed during normal operation. Do not install a
check valve.
7. Suction gauge, recommended
8. Controller: Aquavar IPC
9. City supply
10.To system
_ _ _ _ Dashed lines indicate field installation.
4 Installation
AquaBoost Advanced Pumping Packages INSTRUCTION MANUAL
13
Содержание Goulds AquaBoost Advanced
Страница 1: ...INSTRUCTION MANUAL 10 001 326 AquaBoost Advanced Pumping Packages...
Страница 2: ......
Страница 34: ......
Страница 35: ......