For more permanent installations with a heavily contaminated pumped liquid, a settling
pump-sump is recommended.
WS001380B
Figure 2: Settling pump-sump
Discharge line requirements
The discharge line can be run vertically or horizontally, but must be without sharp bends.
Proper horizontal and vertical installation
Improper installation with a sharp
bend
WS001379A
WS001346A
Fasteners
• Only use fasteners of the correct size and material.
• Replace all corroded or damaged fasteners.
• Make sure that all the fasteners are correctly tightened and that there are no missing
fasteners.
4.1.1 Install with S-installation
In the S-installation, the pump is transportable and intended to operate either completely
or partially submerged in the pumped liquid. The pump is equipped with a connection for
hose or pipe.
These requirements and instructions only apply when the installation is made according
to the dimensional drawing.
1. Run the cable so that it has no sharp bends. Make sure that it is not pinched, and
cannot be sucked into the pump inlet.
2. Connect the discharge line.
3. Lower the pump into the sump.
4. Place the pump on the base and make sure it cannot fall over or sink.
Alternatively, the pump can be suspended with a lifting chain just above the sump
bottom. Make sure that the pump cannot rotate at start-up or during operation.
5. Connect the motor cable and the starter and monitoring equipment according to the
separate instructions.
4 Installation
12
2008 Ready 8, 8S Installation, Operation, and Maintenance