Installation Guide
P. 13
AutoTach
Programming Procedure
This process can be carried out instead of the conventional Tach Programming Procedure.
1.
Make sure all the connections are done properly and that the Module has been
powered-up.
2.
With the Hood up (Ground on the Hood Pin line), start the vehicle using the key.
3.
Let the Engine reach proper idle speed
The Parking Light output from the Module is activated when the vehicle starts and it
will shut off once the Tach signal is detected.
4.
Press and hold the Brake Pedal until the Parking Light output from the Module
flashes 5 times.
5.
Turn the Ignition
OFF
. At this point, the Tach setting has been programmed.
Table 5
Multi-Speed Tach Programming
The system is designed to read a wide range of Tach signals produced by newer Ignition
systems. No manual adjustments are necessary. However, you should go through the Tach
programming procedure every time a new Unit is installed.
1.
FLASH
the Hood Pin Switch.
Before the 20 seconds have passed.
2.
Press and hold the Brake Pedal.
1.
Press the
LOCK
and
UNLOCK
buttons simultaneously on the Transmitter.
2.
The Parking Lights will flash 4 times.
3.
Release the Brake Pedal.
3.
Start the vehicle and let it to reach regular Engine-idle speed.
4.
Once the vehicle is idling properly, press and hold the Brake Pedal until the Parking
Lights flash five times, release the Brake Pedal: the Tach signal is now programmed.
Table 6
NOTE:
If no tach has been programmed and the
START/STOP
button is pressed, there will be no start attempt and the vehicle
will give 5 flashes. If another Tach Programming is required,
simply repeat the Auto Tach Programming Procedures. The
Module stores the Tach setting, being Auto Tach or Multi-Speed
Tach, until the Module is reset.
ONLY
if the Module is reset will a
new Tach Signal need to be re-programmed.
Testing
Before putting back the vehicle together, it is recommended to check that the system
operates properly. The following testing procedures should be used to verify proper
installation and operation of the system. Before testing, make sure that all connections are
soldered and that the unit is plugged in.
1.
Remote-start the Engine and listen for Starter drag.
If the Starter cranks for too
long, carry out another Tach Programming procedure.
2.
Test Hood Switch shutdown
: with the vehicle running under the Remote Starter,
open the Hood; the vehicle should shut down. If it does not shut down, check the
Hood Pin-switch and its connector.