Chapter 5 – Pre-Operation Inspection
XR5919-A 47
Item
Inspect For
P/F/R
Do Not Operate tags
Ensure none have been place on the machine
Load capacity charts
Match the carriage installed and legible
Seat belt and mounting hardware
No damage or deformation, proper operation
Operation and Safety Manual
In protective case and legible
Forks
Welds intact, no cracks, misalignment, damage
or deformation
Carriage fork pins
Straight and in place to prevent forks from
changing position or coming off the carriage
Hoses and connections
No wear or leaks
Tilt cylinder
No leaks, damage or deformation
Boom
Straight, no damage or deformation
Tires and wheels
No punctures, cracks, cuts, gouges, bulges,
foreign objects, or any other damage to tires
No loose or missing lug nuts
No bent flanges or other damage to rims
No low tire air pressure
Mirrors
No cracks, are clean and properly adjusted
Hydraulic reservoir
Proper level. Add if necessary
Engine compartment (check with engine off)
No loose or damaged belts, hoses, or radiator
fan blades
Coolant reservoir at proper level. Add coolant
if necessary.
Engine oil at proper level. Add engine oil
if necessary.
No damage or deformation to electrical wires
and connectors
Front and rear axles
No leaks, damage or deformation
Boom lift/carriage tilt cylinders/hydraulic lines
No leaks, damage or deformation
Battery
Terminals free of corrosion
Case free of cracks, melting, or damage
Labels
In place and legible/no damage.
Replace if necessary.
Operator cab
No trash, debris, or any loose items
Pedals and non-skid surfaces are clean and
free of grease, oil, dirt, snow, or ice.
Pre-Operation Inspection Checklist
Walk around the machine while visually performing the pre-operational inspection. Use the form below to ensure all
items are checked.
Performed
by:
Date:
Model
Number:
Serial
Number:
Maintenance Table Key: P = Pass, F = Fail, R = Repaired
Содержание XR5919-A
Страница 1: ...October 2020 Part Number 24978 001 MANUAL Tier 3 and Tier 4 Final OPERATION AND SAFETY QRGOVSALES ...
Страница 4: ...XR5919 A ...
Страница 10: ...Chapter 1 Introduction 4 XR5919 A ...
Страница 12: ...Chapter 2 Specifications 6 XR5919 A ...
Страница 54: ...Chapter 5 Pre Operation Inspection 48 XR5919 A ...
Страница 66: ...Chapter 6 Operation 60 XR5919 A ...
Страница 68: ...Chapter 7 Emergency Lowering 62 XR5919 A ...
Страница 72: ...Chapter 9 Lockout Tagout 66 XR5919 A ...