2
Chapter 1
:
Safety precautions
1.1
Precautions of transportation, installation and packing
1.1.1
Preparations before installation
1.1.1.1
Power requirement:
Voltage: Look at the nameplate
Current: Look at the nameplate
Frequency: 50/60Hz
Phase: 3Ø
1.1.1.2
Installation requirement
1.1.1.2.1
Prevent to install the machine in the environment full of dust and corrosive
atmosphere with acid and alkali.
1.1.1.2.2
Prevent to install the machine in the environment with abnormal vibration.
1.1.1.2.3
Prevent to install the machine under direct sunlight or near vapor. Such will
affect its vacuum degree.
1.1.1.2.4
The ground circuit should be independently or parallel.
1.1.1.2.5
Don’t install the machine in the potentially explosive atmosphere.
1.1.1.2.6
Installation space includes the requirement of the operator and machine
Length × Width × Height = 2M×2M×2.5M
Содержание CM1500A
Страница 5: ...3 ...
Страница 17: ...15 ...
Страница 19: ...17 ...
Страница 21: ...19 ...
Страница 23: ...21 ...
Страница 25: ...23 ...
Страница 27: ...25 ...
Страница 29: ...27 ...
Страница 31: ...29 ...
Страница 33: ...31 T1 PW K1 STANDARD CHECKED PROCESSED NAME DATE CIRCUUIT DIAGRAM 02 PAGE E D C B A E D C B A MC1 RE1 FU APR ...
Страница 34: ...32 E PAGE 03 CIRCUUIT DIAGRAM DATE NAME PROCESSED CHECKED STANDARD E A B C D A B C D ...
Страница 42: ...40 A B C D E A B C D E DATE NAME PROCESSED CHECKED STANDARD Vacuum system ...
Страница 43: ...41 A B C D E A B C D E PAGE DATE NAME PROCESSED CHECKED STANDARD C1 Gas ...