31
maintenance
MAINTENANCE CHART
PROCEDURE
DAILY
3
MONTHS
6
MONTHS
9
MONTHS
12
MONTHS
Check engine oil level
X
Change engine oil*****
X
X
X
X
Check water pump oil level
X
Change water pump oil **
X
X
X
X
Oil leak inspection
X
Fuel leak inspection
X
Water leak inspection
X
Hose inspection
X
Water inlet screen inspec-
tion
X
Check fuel filter
X
X
X
X
Replace fuel filter
X
X
Inspect belts
X
X
X
X
Replace high pressure
nozzle***
X
X
X
X
Inspect fuel pump filter*
X
Replace fuel nozzle*
X
Check burner air adjust-
ment
X
X
X
X
Check burner electrodes*
X
Test water pressure*
X
X
X
X
Test fuel pressure*
X
X
X
X
Test water temperature*
X
X
X
X
Descale coil****
X
* Must be performed by an authorized service technician.
** The pump oil must be changed after the first 50 hours of operation
and every 250 hours or 3 months, whichever comes first.
*** High pressure nozzle should be replaced whenever pressure is less
than 85%.
**** Scale build-up will vary with mineral content in the water and amount
of usage. Descaling can range from weekly to yearly maintenance.
***** The engine oil must be changed after the first 8 hours of operation
and every 50 hours or 3 months, whichever comes first.
Содержание X-HWTR3524GEN
Страница 1: ...operation manual X HWTR3524GEN HOT WATER PRESSURE WASHER...
Страница 2: ...2...
Страница 13: ...13 features 0 Operator s Manual HS FEATURES HS FEATURES 032905 RZ Features...
Страница 38: ...38...
Страница 39: ...39...
Страница 40: ...40 If you need assistance with the assembly or operation of this Pressure Washer please call 1 866 770 1711...