Installation Planning Guide
8-1
8
Installation
This chapter describes the activities performed by you and Xerox
personnel during the installation of the Xerox DocuPrint 100/115/
135/155/180 EPS hardware and software components. Before
installation can begin, you must complete the tasks described in
the “Preparing for installation” chapter of this guide.
Installation process
Xerox personnel are responsible for the physical installation of the
printing system hardware components and the software.
NOTE: For customers outside the United States, contact your
local Xerox operating company for your specific installation
process.
The installation process can take one or several days to complete.
Equipment, software kits, and documentation kits may arrive in
one day, or over the course of several days. When all of the
necessary items are in place, Xerox personnel will complete the
installation of the printer components.
In the United States, the steps in the installation process typically
occur in the following order:
1. Xerox personnel install all printer hardware and connects the
controller to your site’s network through the Ethernet
connector you supply. This process takes approximately four
hours if all the necessary network and electrical connectors
are in place.
2. Xerox personnel load software on the controller
(approximately 1.5 hours).
3. Xerox personnel download Xerox client software, if applicable,
on one client workstation to validate the installation (15
minutes). Software is downloaded on another client
workstation as part of training conducted by your systems
analyst. All other client software installations are your
responsibility.
4. Xerox personnel test the system and run sample jobs (30
minutes).
5. Xerox personnel conduct initial operations training (four to six
hours).
6. Xerox personnel review preventive maintenance schedules
and service call procedures.
Содержание Nuvera 100
Страница 1: ...installation Xerox DocuPrint 100 115 135 155 180 EPS 701P24750 April 2005 guide planning...
Страница 6: ...iv Installation Planning Guide Table of contents...
Страница 16: ...xiv Installation Planning Guide Introduction...
Страница 76: ...6 28 Installation Planning Guide Printer requirements and specifications...
Страница 77: ...Installation Planning Guide 6 29 Printer requirements and specifications...
Страница 78: ...6 30 Installation Planning Guide Printer requirements and specifications...
Страница 79: ...Installation Planning Guide 6 31 Printer requirements and specifications...
Страница 80: ...6 32 Installation Planning Guide Printer requirements and specifications...
Страница 82: ...6 34 Installation Planning Guide Printer requirements and specifications...
Страница 86: ...7 4 Installation Planning Guide System connections...
Страница 114: ...A 24 Installation Planning Guide Supplies...
Страница 124: ...Installation Planning Guide I 4 Index...