WC68 Operator’s Manual
3. INFEED CHUTE
A. TOP PANEL
The wood chipper infeed chute consists of four (4) metal panels that are bolted together. The
first step is bolting the top panel to the lower flywheel housing that forms the hinge. Using the
hardware listed in the table below, assemble the hinge connection with a 16 mm (shoulder bolt)
and 17 mm (lock nut) socket/wrench. Note that the infeed chute top panel and hinge bracket
come pre-assembled from the factory.
2x
M10 X 15 X
20 mm
Shoulder Bolt
6x
M12 Nylon
Flat Washer
2x
M10 Lock Nut
1x
Infeed Chute
Top Panel
WC68-MY2019: Rev A
Page
of
15
49
27-Sep-2018