Operation
Edger Setup
3
3-6
EGdoc031621
Operation
Have a qualified electrician install the power supply (according to EN 60204). The power
supply must meet the specifications given in the table below.
IMPORTANT!
It is recommended that the electrical system
be equipped with a 30mA Ground Fault Interrupter.
IMPORTANT!
When starting the machine for the first time, check that
the blade rotation direction is as indicated by the arrow located on the
blade housing. If the rotation direction is incorrect, invert the phases in
the phase inverter located in the power socket (electric box). Setting
the phases in the phase inverter correctly will ensure correct rotation
directions of all machine motors.
IMPORTANT!
When starting the machine for the first time, let it run
without any load for 1-2 hours so that the drive components of the
infeed and outfeed tables break in.
3 Phases V
Fused Disconnect
Switch
Recommended Wire Size
400 VAC
40 A
4 mm
2
, maximum length: 15 m
TABLE 3-1
!
!
!
Содержание EG350EH15S
Страница 1: ......
Страница 2: ......
Страница 62: ...Laser Information 7 7 1 MHdoc031621 Specifications SECTION 7 LASER INFORMATION ...
Страница 64: ...Laser Information 7 7 3 MHdoc031621 Specifications ...