Operation
Pre-Operation Check
Operation
EGdoc031621
3-1
3
SECTION 3 OPERATION
3.1
Pre-Operation Check
Before operating the edger, always perform the following basic checks:
1.
Make sure the machine is level. Then secure the edger legs to the floor. To do this, prepare a
concrete foundation and use 12 mm diameter anchor bolts.
CAUTION!
Always make sure the edger is level prior to operating.
Failure to level the machine will affect machine operation and wear life.
2.
Make sure the tables are level with the rest of the edger.
3.
Be sure the anti-kickback fingers are in proper working condition.
WARNING!
Always make sure that there is a sharp point on the
anti-kickback fingers before each use of the edger.
Be sure the anti-kickback fingers are free from obstruction and are in a
downward position with the lever released. Failure to do so may result
in serious injury.
WARNING!
If the drive belt breaks, wait until all moving parts stop.
Failure to do so may result in serious injury or death.
WARNING!
Make sure the anti-kickback lever lock is in the operation
position so that the anti-kickback fingers cannot be raised with the
anti-kickback lever. This position is shown in the figure below.
FIG. 3-1
Anti-Kickback Lever Lock
Содержание EG350EH15S
Страница 1: ......
Страница 2: ......
Страница 62: ...Laser Information 7 7 1 MHdoc031621 Specifications SECTION 7 LASER INFORMATION ...
Страница 64: ...Laser Information 7 7 3 MHdoc031621 Specifications ...