![Wood-mizer 1992 LT30HD Скачать руководство пользователя страница 61](http://html1.mh-extra.com/html/wood-mizer/1992-lt30hd/1992-lt30hd_operation-and-maintenance-manual_994629061.webp)
Setup & Operation
Preparing The Sawmill For Towing
Setup & Operation
HD92doc042701
2-33
2
See Figure 2-21.
11. Remove all loose objects from the bed of the mill. Store the outrigger jack handle in the
bracket provided on the rear/loading-side outrigger guide. Reel in the winch cable.
Remove the winch handle.
12. Place both fenders in the slots located behind the trailer tires. Raise all but the very front
outrigger.
DANGER!
Check to be sure the saw head is resting firmly
on the rest pin and mast rail stops and that the safety chain
is secured before towing the sawmill.
DANGER!
Never operate or tow the sawmill without all
guards and covers in place and secured.
Be sure the blade housing and pulley covers are in place
and secure. If applicable, use the safety retainer pin and
cable to fasten blade housing covers.
See the trailer operator’s manual for specific information regarding hitch operation and
towing the sawmill.
FIG. 2-21