![Wood-mizer 1992 LT30HD Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/wood-mizer/1992-lt30hd/1992-lt30hd_operation-and-maintenance-manual_994629039.webp)
Setup & Operation
Hydraulic Control Operation
Setup & Operation
HD92doc042701
2-11
2
2.8
Hydraulic Control Operation
Revisions E7+
See Figure 2-7. Use the five control levers to do the following steps. This gets the mill
ready to load a log.
FIG. 2-7
Rear
Toe Board
Loader
Turner
Clamp
Front
Toe Board
HD0027