2
3062347_0309
General information
Safety instructions / Standards and regulations
.............
3-5
Installation and commissioning
Dimensions
.......................................................................6
Layout / Equipment code
...............................................
7-9
Positioning information / Installation dimensions
........
10-11
Installation on finished walls /
Installation on unfinished walls
........................................
12
General boiler installation
................................................
13
Electrical connection
.................................................
14-17
Fill / Vent the system.
.......................................................
18
Guidelines for commissioning
..........................................
19
Control / Function / Commissioning
...........................
20-21
Setting and adjusting the boiler
Displaying / Modifying control parameters
................
22-30
DHW connection versions / Resetting control unit
...........
31
Setting the eBUS address for cascade mode
..................32
Commissioning gas connection
.......................................33
Conversion to other gas types / Nozzle change
..............34
Setting the control unit after converting the gas type
.......
35
Checking nozzle pressure
..........................................
36-37
Resetting gas valve / Setting nozzle pressure
.................
38
Adjusting the flue lengths CGG-2(K)
................................39
Flue gas test CGU-2(K) CGG-2(K)
.................................40
Limiting the maximum output
...........................................
41
Selecting the pump stage / Bypass
............................
42-43
Checking the flue gas monitoring CGU-2(K)
....................44
Notes on planning ventilation /
Flue gas system CGU-2(K)
........................................
45-49
Commissioning report
......................................................
50
Maintenance and additional information
Inspection and maintenance steps
..................................
51
Service report
...................................................................
52
Maintenance
..............................................................
53-57
Wiring diagram CGU-2(K)
................................................
58
Wiring diagram CGG-2(K)
................................................
59
Specification
...............................................................
60-61
Fault / Cause / Remedy
...................................................62
Resistance table
..............................................................63
Notes
................................................................................64
Keyword index
...........................................................
65-67
EC declaration of conformity
............................................
68
Contents
Содержание CGG-2-18
Страница 64: ...64 3062347_0309 Notes ...