STEP7

Reinforce the splice. 

l

Slide the fiber protection sleeve to the center of the splice 

and move it to the tube heater. 

]

Check

Make sure the splice point and fiber protection sleeve 

are in the center of the tube heater. 

    

]

 Check

Make sure the reinforcing material is placed dow. 

]

 Check

Make sure the fiber is not twisted. 

2

While applying tension to the fiber, lower the fiber into 

the  tube  heater,  the  left  tube  heater  clamp  will  close 
automatically. 

3

With tension still applied to fiber, close the right tube  

heater clamp with your left hand. 

4

Press

 to start tube-heating cycle. 

 

 

   

 

 

 

§

4

Detail of Splicing Operation

 

§

4

1

Preparations before Splicing Operation 

  Prepare  necessary  items

referring  to  page  7

§

2.3  Other 

Necessary Items for Splice Operation 

§

4

2.Power Supply 

 

Three supplying power to the WY-725: AC Power supply 

internal 

battery

external battery . 

a

Warning

Follow safety instructions

refer to the page 1 to 5

§

1 Warnings and Cautions for Safe Operation 

§

4

2

1

Using AC Power supply

    

To operate the splicer from an AC power supply 176

264VAC

47

63Hz 

l

Confirmation before operation 

a

Check

Make sure the power source is 176

264VAC

47

63Hz.When 

connecting to an AC generator, always check the output voltage 

of the generator with a circuit tester before connecting the AC 
power cord. 

a

Check

Make sure the AC power cord is free from damage,etc. 

(2)Plug AC adapter into splicer. 

(3 )Plug the AC power cord

WY-725-03

into the AC adapter inlet

Make sure plug is fully seated and in the correct position. 
(4)Plug the AC power cord into the wall socket. Make sure plug is fully 

seated and in the correct position. 

(5)Press<

>,turn on splice. 

 

Page 17 

Page 18 

Содержание WY-725

Страница 1: ...splicer from damage moisture vibration and shock during storage and transportation 6 Do not place the splicer in an unstable or unbalanced position The splicer may shift and lose balance causing the unit to fall Possible personal injury or equipment damage may result 7 Keep the splicer free from sand dust lubricants and other contaminants The presence of such substances may degrade the splicing pe...

Страница 2: ...ong core AC power cord NEVER use a two prong core power cord extension cable or plug 19 Use only the approved battery pack with the WY 725 Only the WY 725 01 battery pack can be used as the approved battery pack 20 Use the specified charger cord WY 725 09 to recharge the battery pack WY 725 01 Using other battery chargers and charger cords may cause fuming or equipment damage and result in persona...

Страница 3: ...uld any problem arise please contact your nearest sales agency 2 Description 2 1 Specification Applicable Fiber Single mode and multi mode silica based optical glass fiber Cladding diameter 100 150um Coating diameter 0 1 1 0mm 1 Cleave Length Standard spec 16mm Mean Splice Loss Note 1 Single mode fiber Typ 0 02dB Dispersion shifted fiber Typ 0 04dB Multi mode fiber Typ 0 01 dB Mean Splice Time Not...

Страница 4: ...cording to the ITU T standard Note 2 Mean splicing time Length of time from the start of operation by pressing START till the end of loss estimation Note 3 fiber protection sleeve shrinking time Length of time from the start of heating by pressing till the end of cooling 2 2 Components No Name Model Fig 1 Arc Fusion Splicer WY 725 2 Li Battery WY 725 01 3 AC adaptor WY 725 02 4 AC Power Cord WY 72...

Страница 5: ...otector Tube Heater Handle Power swith Fig 2 3 Splice Main Engine Page 9 Page 10 Lint free tissue or Gauze Thin Cotton Swab WY 105 Cleave Length φ0 25 6 20mm φ0 9 10 20mm Fig 2 2 Other Necessary Items Fiber Protection Sleeve Fiber Pigtail Coat Stripper Dispenser Purity more than 99 LCD Monitor Panel Keyboard Lock RS232 Video output Battery DC adaptor AC adaptor Opposite Auto Heat ...

Страница 6: ...enu move cursor down 2 Manual move fiber down Up 1 Menu move cursor 2 Manual move fiber up Right 1 Menu modify parameter 2 Manual move fiber right Left 1 Menu modify parameter 2 Manual move fiber left Fig 2 4 Right Keyboard Page 11 Page 12 Key Name Function Heat Start stop tube heater Start Start splice operation Reset Splicer Reset Fig 2 5 Left keyboard ...

Страница 7: ...ttery WY 725 01 into splicer Press turn on splicer 3 External battery for fusion splicer Plug DC adapter into splicer Plug one end of DC adapter WY 725 12 into DC adapter an other end into external battery Press Turn on splicer STEP 2 Fiber stripping l Clean the fiber outer coating approx 100mm in length from the fiber end with alcohol impregnated lint free tissue or gauze 2 Pass the fiber through...

Страница 8: ...nter line 2 Gently close the sheath clamp 3 Close the wind protector STEP4 Select Suited Splicer Mode Press into the setup program menu Select Program be selected suited splicer program of 3 column Refer page 50 6 4 Select Program STEP5 Splicing operation Press to start splicing Refer to page 26 4 6 Splicing operation STEP6 Fiber removal 1 Open the wind protector 2 Open the left and right sheath c...

Страница 9: ...Items for Splice Operation 4 2 Power Supply Three supplying power to the WY 725 AC Power supply internal battery external battery aWarning Follow safety instructions refer to the page 1 to 5 1 Warnings and Cautions for Safe Operation 4 2 1 Using AC Power supply To operate the splicer from an AC power supply 176 264VAC 47 63Hz l Confirmation before operation aCheck Make sure the power source is 176...

Страница 10: ...cer 4 2 3 Using external battery Plug DC adapter into splicer Plug DC Cord one end into DC adapter an other end into external battery Press turn on splicer 4 3 Turning On Splicer Power aCheck To obtain a good splicing quality perform the cleaning and checking procedures before beginning splicing operation Refer to page 35 4 3 1 Power On Pressing turns on the power and displays Power On Menu Page 1...

Страница 11: ...er end with alcohol impregnated gauze or lint free tissue If dust or other impurities on the outer coating enter the fiber protection sleeve burnout or breaking of fiber may result after completion of installation 4 4 2 Passing through Fiber Protection Sleeve Pass one fiber through the fiber protection sleeve Refer to Fig 4 2 Fig 4 2 Setting Fiber Protection Sleeve Page 22 Fiber Pass Fiber Tension...

Страница 12: ... is 16mm Notes detail steps Please refer to the fiber cleaver instruction 4 5 Setting Fiber in Splicer 1 Open the wind protector 2 Open the left and right sheath clamps 3 Place fiber in the V groove aCheck Make sure the fiber is not twisted when setting it into the splicer aCheck If the fiber coating has curl memory or bend memory Load the fiber in such a manner that the crown curve of the memory ...

Страница 13: ...ually inspect the fiber image on the monitor to confirm acceptance or rejection during the various stage of the splicing process 1 Start of splicing Pressing moves the left and right fibers forward After completion of cleaning arc discharge the fibers stop at the predetermined position aNote When the fiber are moving forward and they appear to hop up and down contamination may be present in the V ...

Страница 14: ...ts an extremely bright glow hot spot which is created by burning contaminants located on the surface or end face of the glass there is a possibility of the fiber core will be deformed Although deformation can be detected by the loss estimation function a re splice is recommended Fig 4 11 Fibers Being Spliced 4 Splice Inspection When the spliced state is abnormal the splicer displays an errormessag...

Страница 15: ...displayed on the screen Fig 4 14 Result of Fiber Splicing In some cases the splice loss can be improved with the re arc feature Press the After re arc discharge Not displayed of splice loss aNote There are cases when the splice loss will deteriorate after re arc discharge Bubble Flange Thick Black line Shadow White Line Faintness filament Cladding off Core off Dust Page 29 Fig 4 9 Examples of good...

Страница 16: ...and move it to the tube heater aCheck Make sure the splice point and fiber protection sleeve are in the center of the tube heater aCheck Make sure the reinforcing material is placed downward aCheck Make sure the fiber is not twisted 2 While applying tension to the fiber lower the fiber into the tube heater The left heater clamp will close automatically 3 Tension fiber close the right heater clamp ...

Страница 17: ...ere Put in carrying case in time of the fusion splicer after fusion aCheck Cut off the power before storing aCheck Cleaning the crucial parts in time Pickup camera Lamp house lens Fiber press and V groove Wipe off the dust and dunghill aCheck Would the LCD surveillance screen vertical vail Entireness cling to the fusion splicer aCheck Unchain the having line put in the carrying case aCheck Lift th...

Страница 18: ... a clean dry swab Fig 5 l Cleaning V grooves with Cotton Swab han 99 pure Check Use care not to contact the electrode tips Check Do not use excessive force when cleaning the V grooveThe V groove armmay be damaged 3 If the contaminants in V groove cannot be removed with an alcohol impregnated thin cotton swab use a cleaved fiber end face to dislodge contaminants from V groove bottom Repeat step 2 a...

Отзывы: