x1
x1
x2
4B
4C
x1
x2
3A
3B
6
6
5
15
26
26
STEP 4
- Fix each handlebar (10 / 11) to the vertical pipe (4A), using the screw 21 (2 pcs.).
- Attach upper foot tube (8) to the vertical pipe (4B), using the screw 18 (1 pc.) and the washer 24 (1 pc.).
- Assemble bike pedals (7) to the main frame tube (4C); tighten the screws with a tool.
4B
4A
4C
STEP 3
- Fix the foot tube (5) to the vertical pipe (3A), using the knob (15).
- Attach foot tube pedals (6) to the foot tube (3B), using the screw 26 (2 pcs.).
3A
3B
4A
4C
4B
11
10
8
7
7
18
24
21
Содержание TOTAL CRUNCH EVOLUTION
Страница 1: ...TOTAL CRUNCH EVOLUTION EN ES IT DE PT...
Страница 2: ......
Страница 28: ...MADE IN CHINA TOTAL CRUNCH EVOLUTION...