background image

Pioneering for You

Wilo China Ltd.                            
No. 10 Zhaofeng 2nd Street, Zhaofeng Industrial
Zone (Airport Industrial Zone C)
Zhaoquanying, Shunyi District
101300 Beijing
China
T +86 10 52347888
F +86 10 52347666
 [email protected]
www.wilo.com.cn

Содержание Wilo-FAG

Страница 1: ...Wilo FAG Pioneering for You en Installation and operating instructions...

Страница 2: ...2 13 8 2 14 8 2 15 8 3 8 3 1 8 3 2 8 3 3 8 3 4 8 3 5 10 3 6 10 3 7 10 3 8 10 4 11 4 1 11 4 2 11 4 3 11 4 4 11 5 11 5 1 11 5 2 11 5 3 12 5 4 12 5 5 12 5 6 13 5 7 13 5 8 13 6 13 6 1 13 6 2 13 6 3 13 6 4...

Страница 3: ...5 1 1 1 18 1 2 1 3 Wilo China Ltd 10 101300 010 52347888 010 52347666 E mail wilo info wilo com cn Http www wilo com cn 1 4 2 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 GB EU 2 10 IP68 2 11 PTC 2 12 70 110 8...

Страница 4: ...6 7 2 13 12 18 2 14 2 15 S1 S2 S2 15 15 2K S1 S2 15 3 3 1 3 2 3 3 30 10 10 1 2 30kW 1050kg m3 1 106 m2 s PH 6 9 40 25 400mm 3 4 F B IP68 30kW 3 1 4kW 4kW 1 2 3 4 5 6 7 8 9 10 11 12 13...

Страница 5: ...2 3 4 5 6 7 8 9 10 11 12 13 14 30kW 1 2 3 4 5 6 7 8 9 10 11 12 13 14 3 2 5 5 22kW 3 5 FAG 100 C 25 100 75 Cutter FA G 100 mm C C Z Cutter 25 m 100 m3 h 75 kW 10 3 6 40 3 7 3 8 4 4 1 4 2 4 3 1 15 5 25...

Страница 6: ...10 11 5 3 40 5 4 5 5 S2 6 5 1 40 5 6 5 7 5 8 6 S1 6 1 7 6 2 6 3 30...

Страница 7: ...58 3 5 70 3 4KW 5 5kW PTC 5 5kW 30kW 5 5 kW 22kW K1 K2 K3 PTC K1 K2 K3 30kW PTC K1 K2 K3 K4 K7 K1 K2 K3 K4 K7 30kW K5 K6 22kW FAG Y 6 5 5 2 5 1 5 7 9 0 7 1 2 1 3 10 3 5 1 7 50 10 7 1 O 7 2 7 3 7 4 50...

Страница 8: ...14 15 K3 200K K3 100K K3 K4 200K 0 K4 5K K5 K6 K7 K4 K3 200K 100 200K 100K 35 45 50 0 5 1 7 5 8 8 1 5 8 2 40 8 3 7 5 6 9 2 9 1 1 9 1 2 9 2 3 9 3 4 9 4...

Страница 9: ...4 Constrution 24 3 5 Type designation 25 3 6 Cooling 25 3 7 Technical data 25 3 8 Special explanation 25 4 Transport and storage 25 4 1 Delivery 25 4 2 Transport 25 4 3 Storage 26 4 4 Returning to the...

Страница 10: ...that they can be found quickly Sufficient ventilation must be provided in enclosed rooms When welding or working with electronic devices ensure that there is no danger of explosion Only use fastening...

Страница 11: ...onnel The maintenance and inspection log supplied must be properly updated This enables you to monitor the status of inspections and maintenance work Quick repairs not listed in this operation and mai...

Страница 12: ...ber electrode depending on the model Depending on the connection a warning signal can be displayed and or the machine switched off if water enters the motor chamber terminal chamber or the sealing hou...

Страница 13: ...be laid out for each machine You must ensure that lifting gear can be fitted without any trouble since this is required for assembly and removal of the machine It must be possible to safely reach the...

Страница 14: ...7 6 2 Electrical system Observe the relevant local and national regulations when laying out and selecting the electric lines as well as when connecting the motor The motor must be protected by a motor...

Страница 15: ...ine parts made by the manufacturer A trial run or functional test of the machine must be performed as instructed in the general operating conditions 7 1 General overhaul During this the bearings shaft...

Страница 16: ...t the machine if it is in perfect condition and ready for operation 9 Troubleshooting In order to prevent damage or serious injury while rectifying machine faults the following points must be observed...

Страница 17: ...ith mechanical strain Check the installation use rubber spacers if necessary Fault6 Mechanical shaft seal leaks sealing chamber monitor reports fault and switches the machine off Cause Remedy Condensa...

Страница 18: ...ou Wilo China Ltd No 10 Zhaofeng 2nd Street Zhaofeng Industrial Zone Airport Industrial Zone C Zhaoquanying Shunyi District 101300 Beijing China T 86 10 52347888 F 86 10 52347666 wilo info wilo com cn...

Отзывы: