Shut-down/dismantling

20

WILO SE 2019-10

7.6

Switching on and off

During the start process, the rated current is temporarily exceeded. During operation,
the rated current may no longer be exceeded. 

CAUTION! If the pump does not start,

switch off the pump immediately. Remove the fault before reactivating the pump!

Pumps with bare cable end

The pump is switched on and off using a separate operating point (on/off switch,
switchgear) provided by the customer.

Pump with attached plug

ƒ

After inserting the plug into the socket, the pump is ready for operation. The pump
is switched on and off with the ON/OFF switch.

Pump with attached float switch and plug

ƒ

After inserting the plug into the socket, the pump is ready for operation. The pump
is controlled via two switches on the plug:

HAND/AUTO: Determines if the pump is switched on and off directly (HAND) or
depending on the fill level (AUTO).

ON/OFF: Switches the pump on and off.

7.7

During operation

WARNING
Amputation of limbs due to rotating components!

No persons must be present in the work area of the pump! There is risk of (serious)
injuries due to rotating components! No persons must be present in the work area of
the pump during start-up or operation.

WARNING
Risk of burns from hot surfaces!

Motor housing can become hot during operation. It may cause burns. Allow the
pump to cool down at ambient temperature after switching it off!

When operating the pump, observe the locally applicable regulations on the following
topics:

ƒ

Workplace safety

ƒ

Accident prevention

ƒ

Handling electrical machines

Strictly comply with the personnel responsibilities specified by the operator. All person-
nel are responsible for ensuring compliance with responsibilities and regulations!

Due to their design, centrifugal pumps have rotating parts that are easily accessible.
Depending on operating conditions, sharp edges can develop on these parts. 

WARN-

ING! This can lead to cuts and limbs may be severed!

 Check the following at regular

intervals:

ƒ

Operating voltage (+/-10 % of the rated voltage)

ƒ

Frequency (+/-2 % of the rated frequency)

ƒ

Current consumption between individual phases (max. 5 %)

ƒ

Voltage difference between the individual phases (max. 1 %)

ƒ

Max. switching frequency

ƒ

Level control device/dry-running protection: Switching points

ƒ

All gate valves open

8

Shut-down/dismantling

8.1

Personnel qualifications

ƒ

Operation/control: Operating personnel must be instructed in the functioning of the
complete system.

ƒ

Electrical work: A qualified electrician must carry out the electrical work.

ƒ

Installation/dismantling: The technician must be trained in the use of the necessary
tools and fixation materials for the relevant construction site.

8.2

Operator responsibilities

ƒ

Locally applicable accident prevention and safety regulations of trade associations.

ƒ

Observe regulations for working with heavy loads and under suspended loads.

Содержание Padus PRO

Страница 1: ...Pioneering for You Wilo Padus PRO 6084247 Ed 02 2019 10 en Installation and operating instructions...

Страница 2: ......

Страница 3: ...3 Operating modes 11 4 4 Operation with frequency converter 11 4 5 Operation in an explosive atmosphere 11 4 6 Technical data 11 4 7 Type key 12 4 8 Scope of delivery 12 5 Transportation and storage...

Страница 4: ...g fluid 23 9 4 Maintenance intervals 23 9 5 Maintenance measures 24 10 Repairs 26 10 1 Adjusting the impeller clearance 26 11 Faults causes and remedies 27 12 Spare parts 30 13 Disposal 30 13 1 Oils a...

Страница 5: ...law The defects are reported in writing to the manufacturer within the warranty period Application according to intended use All monitoring devices are connected and tested before commissioning Exclus...

Страница 6: ...ARNING Failure to follow the instructions can lead to serious injuries CAUTION Failure to follow the instructions can lead to property damage and a possible total loss NOTICE Useful information on han...

Страница 7: ...rical work must be carried out by a qualified electrician Before commencing work disconnect the product from the mains and secure it against being switched on again Observe applicable local regulation...

Страница 8: ...g if the operator s field of vision is blocked Persons must not stand underneath suspended loads Do not move suspended loads over workplaces where people are present 2 7 Installing dismantling Wear th...

Страница 9: ...ure of several bar can build up in the motor This pressure escapes when the screw plugs are opened If screw plugs are opened without due cau tion they can be ejected at high speed To avoid injuries ob...

Страница 10: ...received and read the work regulations The submersible pumps must not be used for pumping Drinking water Sewage with or without faeces Acids or alkaline solutions Fluids containing hard components suc...

Страница 11: ...ch The plug is designed for use in commercially available shock proof or CEE sockets and is not overflow proof 4 2 Monitoring devices The thermal motor monitoring protects the motor winding from overh...

Страница 12: ...multi channel impeller 08 Size L Hydraulics n a standard version L low pressure version T Mains connection version M 1 T 3 039 10 rated power P2 in kW 5 Mains connection frequency 5 50 Hz 6 60 Hz 40...

Страница 13: ...if unprotected and may be damaged Lift wet packaging carefully and replace it immediately Only remove the outer packaging at the place of utilisation to ensure that the pump is not damaged during tran...

Страница 14: ...rvice if the mixer has to be stored for more than 6 months After storage remove any dust and oil from the pump and check the coating for dam age Repair damaged coatings before further use 6 Installati...

Страница 15: ...n must have a firm surface Attach the lifting gear to the handle using a shackle Only use lifting gear which has been technically approved The laid connection cables must enable safe operation Check w...

Страница 16: ...ign the pump at the installation location 3 Place the pump on a solid load bearing surface CAUTION Prevent the pump sink ing in 4 Lay the pressure hose and fasten it to a certain point e g drainage DA...

Страница 17: ...he local regulations In case of sensitive mains make provision for the installation on site of other protective equipment e g overvoltage undervoltage or phase failure re lay etc Residual current devi...

Страница 18: ...verflow proof Observe the information on the protection class IP of the plug DANGER If the pump is to be connected directly to the switchgear arrange for the electrical connection to be carried out by...

Страница 19: ...direction of rotation If the direction of rotation is incorrect exchange the two phases at the mains connec tion Pumps with CEE plug and phase inverter AUTO RESET 180 ON OFF 1 2 Fig 6 Phase inverter 1...

Страница 20: ...e pump to cool down at ambient temperature after switching it off When operating the pump observe the locally applicable regulations on the following topics Workplace safety Accident prevention Handli...

Страница 21: ...dry run is not permitted Non compliance can result in irreparable damage 8 4 Removal DANGER Danger due to fluids hazardous to health If the pump is used in fluids hazardous to health decontaminate th...

Страница 22: ...quirement observe the spe cifications of the work regulations The operator must make sure that the personnel have received and read the work regulations Pump is dismantled Contaminated cleaning water...

Страница 23: ...icable guidelines Provide the tools required If flammable solvents and cleaning agents are used open flames naked lights and smoking are prohibited 9 3 Operating fluid 9 3 1 Oil types Medicinal white...

Страница 24: ...s Cracks Scratches Abrasion Pinch points If damage is identified on the connection cable decommission the pump immediately Have the connection cable replaced by Wilo customer service Only operate the...

Страница 25: ...mantled and cleaned decontaminated if required 1 Position the pump in a horizontal position on a firm surface The screw plug should face upwards WARNING Risk of hands being crushed Make sure that the...

Страница 26: ...be met prior to starting repair work Pump cooled down to the ambient temperature Pump is switched voltage free and secured against being activated inadvertently Pump cleaned thoroughly and disinfecte...

Страница 27: ...ction strainer with baseplate in place 14 Screw in the four hexagon nuts with washers and tighten Max tightening torque 20 Nm Impeller clearance corrected 11 Faults causes and remedies DANGER Danger d...

Страница 28: ...ing to the technical specifications by a qualified electrician and reset monitor ing equipment Check the impeller to make sure that it runs smoothly clean the hydraulics if necessary Fault Pump starts...

Страница 29: ...er clearance too great Adjust the impeller clearance 8 Pipe system on the pressure side or pressure hose clogged Remove clogging and replace the damaged components if necessary 9 Strongly gassing flui...

Страница 30: ...rotective clothing Used protective clothing must be disposed off in accordance with the locally applicable guidelines 13 3 Information on the collection of used electrical and electronic products Prop...

Страница 31: ...ilo it Kazakhstan WILO Central Asia 050002 Almaty T 7 727 312 40 10 info wilo kz Korea WILO Pumps Ltd 20 Gangseo Busan T 82 51 950 8000 wilo wilo co kr Latvia WILO Baltic SIA 1019 Riga T 371 6714 5229...

Страница 32: ...Pioneering for You WILO SE Nortkirchenstr 100 44263 Dortmund Germany T 49 0 231 4102 0 T 49 0 231 4102 7363 wilo wilo com www wilo com...

Отзывы: