P
OSITION
I
T
PI-150
AND
PI-75
TP-5129001-J
2-1
January 2022
Section 2
Installation
This section describes the installation of the system and provides general procedures that must
be followed to ensure a successful installation.
2.1 Pre-Installation Check
Before installing the system:
•
Be sure to read and understand the entire installation procedure before beginning
installation.
•
Ensure that only a properly trained and qualified certified electrician performs electric
installations and maintenance.
•
All required tools are readily available.
•
That the following warnings are understood and followed:
Mounting Structure Hazard!
Before installation, be certain the mounting structure is capable of
resisting forces generated from all loading and environmental conditions including, but not limited
to system size and weight, payload size and weight, sail size, and wind speed. Mounting the
system to a structure unable to resist the forces generated from customer-specific loading
scenario could result in death or serious injury and could damage the system.
Safety Instruction
– Mounting Instructions!
Be sure to understand all mounting instructions.
The mounting hardware must include proper means to resist vibration loosening such as thread-
locking compound or locking hardware. Failure to follow mounting instructions can result in
death or injury.
Trained Personnel Only!
Only trained and qualified personnel should perform installation,
adjustments, and servicing. Only a properly trained and qualified certified electrician should
perform electric installations and service. Death or serious injury could result if proper
installation, inspection, operation, and maintenance procedures are not observed.
Equipment Damage!
Only mount the positioner so that the positioner base faces down. Do not
mount the positioner upside down. Failure to follow mounting instructions can result in damage
to the positioner.
Содержание 5061001
Страница 2: ......
Страница 8: ...POSITIONIT PI 150 AND PI 75 vi TP 5129001 J January 2022 ...
Страница 34: ...POSITIONIT PI 150 AND PI 75 2 14 TP 5129001 J January 2022 ...
Страница 44: ...POSITIONIT PI 150 AND PI 75 4 2 TP 5129001 J January 2022 ...
Страница 50: ...POSITIONIT PI 150 AND PI 75 5 6 TP 5129001 J January 2022 ...
Страница 56: ...POSITIONIT PI 150 AND PI 75 7 2 TP 5129001 J January 2022 ...
Страница 57: ...POSITIONIT PI 150 AND PI 75 TP 5129001 J 7 1 January 2022 ...
Страница 59: ...POSITIONIT PI 150 AND PI 75 TP 5129001 J 7 3 January 2022 ...
Страница 61: ...POSITIONIT PI 150 AND PI 75 TP 5129001 J 7 5 January 2022 ...
Страница 63: ...POSITIONIT PI 150 AND PI 75 TP 5129001 J 7 7 January 2022 ...
Страница 65: ...POSITIONIT PI 150 AND PI 75 TP 5129001 J 7 9 January 2022 ...
Страница 67: ...POSITIONIT PI 150 AND PI 75 TP 5129001 J 7 11 January 2022 ...