
OPTIMUM ROUND IN-GROUND WITH STEP
Section 2
Step 11
–
Concrete Collar
11.1
Use the included step footprint for the specific pool size to
ensure the layout dimensions are correct and adjust
accordingly. Distance between all panel joints should be
identical.
11.2
Make
sure
the
supplied
3/8”
x 15”
rebar
(#77001)
is
inserted halfway into the ground through every Anchor
Plate hole around the perimeter of the pool. Also insert
two lengths of rebar through the hole on the A-frame
assembly from step 6.5. If extra supports are required for
patio or other pool features, consider installing them
before pouring the concrete.
Note - Double check the pool is level and square
before pouring concrete!
11.3
A concrete collar is required on all in-ground pools. Pour
8”
high
by 12”
wide
concrete
collar
around
the
perimeter
of the pool. Pour concrete foundation around the backside
of the step. (See footprint for recommended quantity)
11.2
11.3
Note: Do not fill with water until concrete has cured.
46
Содержание 95-0770
Страница 1: ......