
OPTIMUM ROUND IN-GROUND WITH STEP
Section 2
Step 3
–
Install Patio Blocks
3.1
Mark exact pool radius using the center stake.
Using the chart on this page, in accordance with the pool
footprint, mark the locations of the patio blocks.
Note:
installations with the polymer step, substitute two
full sized panels for two smaller filler panels along
with the step.
Adjust patio block position accordingly.
Break patio block into two halves to allow rebar to later
be installed through the anchor plate (Figure 3.2). Sink a
patio block flush into the ground at each mark
.
All patio
blocks must be flush with the ground, solid and level with
the ground and each other in all directions.
Panel joints will be located over each patio block. Place
an anchor plate (#77004) on top of each patio block.
3.2
3.1
16FT POOL SHOWN
Pool Size
16'
18'
21'
24'
27'
30'
Patio Block
Spacing
73-1/2" 82-5/8" 77-7/8"
89"
100-1/8" 93-3/16"
Reference
Angle
Between
Markings
45 Deg 45 Deg
36 Deg
36 Deg
36 Deg
30 Deg
32
Содержание 95-0770
Страница 1: ......