
OPTIMUM ROUND IN-GROUND WITH STEP
Section 2
Step 10 - Installing Top Coping
2” PVC
Coping
(If Applicable)
10.1
Place 2" PVC Top Coping onto each pool panel, leaving a
1/2”
gap
between
each
length. Coping
should
be
offset from
wall panel joints by 2" as shown.
10.2
Each length of Top Coping will be attached to the pool with 5
screws from the exterior side of the pool only. Drill evenly
spaced 1/8" pilot holes through the Top Coping and exterior
pool wall while making sure the Top Coping is fully seated.
Affix the Top Coping to the pool panels with colored head cap
screws #8
x
1/2”
(#99-0138) taking care not to overtighten.
NOTE:
Placement of screws should be
at least 4"
from each
end of the top coping lengths to ensure easy installation of
Coping Clips.
10.1
10.2
44
Содержание 95-0770
Страница 1: ......