13
WIKA operating instructions model TC52-M
14502900.01 12/2021 EN/DE/FR/ES
EN
Continue drilling through the insulation. Drill by steps of approximately 25 mm [1 in] and
remove debris as required. Check that you have not reached the vessel surface after each
step.
5. Commissioning, operation