15
13.
Lock push-fit collars using the
push-fit release/lock tool
using the single end to lift the
grey locking collars.
14.
Insert 2 Blanking Plugs into
unused inlets by pushing in
firmly and lock using tool.
15.
Before making any electrical
connection turn on water
supplies and check supply
connections for leaks.
16.
Feed mains cable through
cable clamp and connect
electrical supply to marked
terminals in the following
manner:
L - Live terminal block
N - Neutral terminal block
E - Earth stud screw
17.
Ensure that all terminal
connections are tight and that
no insulation is pinched.
18.
Secure the cable clamp to
prevent strain on the terminal
block.
Warning!
Do not switch on the
electrical supply until the
COMMISSIONING
has been
completed and the cover securely
fitted.