ITEMS TO ROUTE BEFORE INSTALLING THE EVAPORATOR UNIT - KDT
1.
Route the line set from the condensing unit to the desired evaporator unit installation location.
2.
Route the communication cable from the desired location to the evaporator installation location.
3.
Route the display cable from the desired location to the evaporator installation location.
4.
Route the bottle probe cable from the desired thermostat bottle location to the evaporator unit installation
location.
5.
Route the drain line from a proper discharge location to the evaporator unit installation location.
6.
Route the power cable wiring to the evaporator unit installation location.
Condensing Unit Power
Line Set
Display Cable
Bottle Probe
24V Communication
Cable
Power Cable
Drain Line
Discharge Location
Page 10
08/04/21