-22-
G
B
!
!
!
!
Fill half the bath with water and check whether the bath is still horizontal. This is necessary. Use the adjustable legs
for correction. Check whether the drain pipeline connection is watertight and then top up the bath upto the overflow
outlet. Allow the same to overflow and check the sealing and proper drainage of water via the overflow connection.
The open sides of the bath may be finished with plastic panels or with a tile wall. This may be done for the entire rim,
or only in certain sections.
For sealing the bath joints, only use acid-free silicon sealant suitable for plumbing applications.
The bath may be placed in several ways:
- The bath may be placed against the tiles of the wall. Apply
all around the rim to absorb the
movements of the bath if any.
- In case of installation of the bath in an alcove (wedged between two walls) and/or finished with a
horizontal row of tiles placed on the rim of the bath, the joint (4-5mm) between the rim of the bath and the
row of tiles and/or wall should also be sealed using silicon sealant. This 4-5mm space is required to
absorb the torsional forces acting on the rim of the bath.
- When the bath is finished with a wall on the underside instead of a plastic panel, there should be a joint
between the top of the wall or row of tiles and the bottom of the bath, of 4-5mm.
This joint must also be sealed.
The silicon sealant provides a good watertight finishing joint and allows the bath to expand to some extent. It
is also necessary to fill the bath with water upto the overflow rim and to ensure that the bath is resting properly
on all its legs before you start sealing.
In case of doubt, consult a plumbing specialist.
silicon sealant
1.5.1
Ventilation grid.
In order to ensure optimum operation of the motor(s), it is necessary to install a ventilation grid in the edge or in the wall
under the bath. This grid must be splash-proof and placed so that splashing water does not find its way under the bath.
The minimum effective flow surface of the grid must be 100cm², and should not vent in places where the temperature is
less than +15°C and more than +35°C. (See Fig. 4: Ventilation grid).
In case of doubt, consult a plumbing specialist.
1.5.2
Inspection hatch(es).
A splash water proof inspection hatch must be installed in the bath edge or in the wall, the minimum size of which must
be 40x50cm, in order to enable maintenance work to be carried out. It will be necessary to provide a separate hatch for
every motor in order to make service possible. (See Fig. 5: Inspection hatch(es). See Price List for the placement of the
hatches. You can order Riho magnetic tile inspection hatch sets from your dealer. Riho Article no. ZA 110000000005.
The Riho Service department cannot provide service if the inspection hatches are absent or are too small. Ensure the
optimum accessibility of the system, Riho recommends the use of plastic front panels (if available for this type of bath).
In case of doubt, consult a plumbing specialist.
I
/O
IH
R
O
Fig. 4: Ventilation grid
I
/O
IH
R
O
Z1209003.4
GB
Votre revendeur : DUVIVIER sàrl - www.duvivier.lu
Содержание RIHO
Страница 2: ...NL Z1209003 4 NL Votre revendeur DUVIVIER sàrl www duvivier lu ...
Страница 18: ...GB Z1209003 4 GB Votre revendeur DUVIVIER sàrl www duvivier lu ...
Страница 34: ...D Z1209003 4 D Votre revendeur DUVIVIER sàrl www duvivier lu ...
Страница 50: ...F Z1209003 4 F Votre revendeur DUVIVIER sàrl www duvivier lu ...
Страница 64: ... 64 Figure 11 F Z1209003 4 F Votre revendeur DUVIVIER sàrl www duvivier lu ...
Страница 66: ...Z1209003 4 F Votre revendeur DUVIVIER sàrl www duvivier lu ...
Страница 67: ...Enjoy the RIHO life style Votre revendeur DUVIVIER sàrl www duvivier lu ...