8. With all anchor bolts torqued as specified operate the lift checking its full operation.
If anchor bolts do not tighten to 55 ft-lbs. OR project more than 2 ¼” above the concrete
surface, the concrete should be replaced by an appropriate concrete pad. (Consult Product
Manufacturer / Supplier for further details
Figure 6. Anchoring
6.9 INSTALLATION FOR ALIGNMENT MODELS 9004, AND 9005
1.
Locate and install two (2) front wheel stops; one (1) to the front of each of the runways
using six long hex head bolts, flat washers, lock washers, and nuts.
NOTE:
The 9005 has a front tie bar which must be installed in between the front of the deck
and the front wheel stop.
2.
Unpack the levelling legs as marked on the leg and mounting hardware and place in their
respective locations.
NOTE:
On the long alignment models (9005) the rear levelling
legs fold up toward the rear, whereas, on the shorter alignment model (9004) the legs fold
up toward the front of the lift.
3.
Position but do not tighten all levelling leg brackets. The levelling legs should hang in
the
brackets and swing freely. Thrust washers are provided to take up any side play in legs,
install if required. Install thrust washers if there is more than 1/8”(3mm) clearance.
4.
Check that legs hang perpendicular to the ground BEFORE tightening leg bracket bolts.
5.
Lower the Space Saver lift down onto the levelling legs.
6.
Check and adjust the decks for level using the 4’ level. Adjusting screw and jam nuts
should be adjusted until each corner of lift is level. Make sure jam nuts are tightened after
levelling. Both the front turn plate cutouts and rear slip plates should be checked. Refer
to
Figure 7
.
Содержание SPACESAVER 9000 Series
Страница 21: ...21 of 31 11 PARTS MANUAL 11 1 SPACE SAVER ALIGNMENT...
Страница 24: ...24 of 31 11 3 SPACE SAVER SERVICE RUST PROOFER...
Страница 28: ...28 of 31 11 7 SPACE SAVER HYDRAULICS...
Страница 30: ...30 of 31 11 9 9 000 LB SPACE SAVER POWER PACK...