The Right Side base frame should now be levelled.
- Shim across from side “B” to side “C” (check along side “C” from front to back)
-
Shim across from side “C” to side “D” (check along side “D” from front to back)
-
Shim along side E & side F (locking Mechanism)
Both base frames should now be levelled from front to back and side to side.
NOTE: Base frame levelling should be performed as a reference before main levelling of the
decks.One last check before anchoring is to make sure that there is 36” between the
baseframes
.
Figure 5. Leveling procedure example
6.8 ANCHORING
PROCEDURE:
1. Raise the lift to full height and repeat the measurements, and ensure there are no
differences.
2. Using a rotary hammer drill and a 1/2” concrete bit, drill through the floor at each of the
six (6) anchor bolt locations on each of the base frames. Make sure that the 1/2” concrete
drill bit is in good condition. Refer to
Figure 6
.
3. Assemble the nut and washer onto the 1/2” x 4 1/2” long wedge anchor bolts supplied. A
minimum of six threads must be visible below the surface of the nut.
4. Clean out the drilling dust from the holes and hammer in the anchors until they make
contact with the baseplate.
Hand tighten all anchor bolts
.
5. Torque all anchor bolts to 55 ft-lbs.
6. Position the console in the final desired location. Using a rotary hammer drill and a 1/4”
concrete bit, drill and anchor the console to the floor using the Nail in Anchors located in
the hardware kit.
7. Use the line covers to protect all cables, hoses, and wiring running to the lift. Using a
rotary hammer drill and a ¼” concrete bit, drill and anchor the line covers using the nail
in anchors located in the hardware kit.
Содержание SPACESAVER 9000 Series
Страница 21: ...21 of 31 11 PARTS MANUAL 11 1 SPACE SAVER ALIGNMENT...
Страница 24: ...24 of 31 11 3 SPACE SAVER SERVICE RUST PROOFER...
Страница 28: ...28 of 31 11 7 SPACE SAVER HYDRAULICS...
Страница 30: ...30 of 31 11 9 9 000 LB SPACE SAVER POWER PACK...