
page Contents – 2
G-3 / Jun 2004
C O N T E N T S
Chapter 4 - Host CPU (HC-3)
Overview ........................................................................................4-2
HC-3 BIOS Settings/Format .......................................................... 4-2
Ethernet IP Addressing ................................................................ 4-2
Ethernet Interface Wiring ............................................................. 4-2
Mixer Link Wiring .......................................................................... 4-3
Internal Programming Options .................................................... 4-3
Switch Settings ............................................................................. 4-3
SW1 Position 1 - Sample Rate ................................................................................. 4-3
SW1 Position 4 - CAT5 Enable ................................................................................ 4-3
SW2 - CPU Reset ..................................................................................................... 4-3
Hook-Ups
“ETH” RJ-45 - Main Ethernet Connector .................................................................. 4-4
“CAT5” RJ-45 - Mixer Link Connector ...................................................................... 4-4
“CUE SPKR/HDPN” - Cue Speaker/Headphone Connector .................................... 4-4
Typical Ethernet Cable ................................................................. 4-5
Typical Crossover Cable .............................................................. 4-5
HC-3 Pinouts Drawing .................................................................. 4-6
Chapter 5 - Meterbridge and Clock
Overview ........................................................................................5-2
Control Surface Clock .................................................................. 5-3
Setting the Time ........................................................................................................ 5-3
Update Options ......................................................................................................... 5-3
Synchronize .............................................................................................................. 5-3
Battery Backup ......................................................................................................... 5-4
Surface Software Version ............................................................. 5-4
Chapter 6 - Schematic and Load Sheet Drawings
IP-3 4 Inputs Panel Switch Card
Schematic ................................................................................................................. 6-2
Load Sheet ................................................................................................................ 6-5
MN-3 Control Panel Switch Card
Schematic ................................................................................................................. 6-6
Load Sheet ................................................................................................................ 6-9
HC-3 Host Controller Card
Schematic ................................................................................................................ 6-10
Load Sheet ............................................................................................................... 6-14
G-3 / Oct 2004
Содержание G-3
Страница 1: ...G 3 Digital Control Surface TECHNICAL MANUAL 600 Industrial Drive New Bern North Carolina USA 28562 ...
Страница 36: ...page 6 2 G 3 Jun 2004 ...
Страница 37: ...page 6 3 G 3 Jun 2004 ...
Страница 38: ...page 6 4 G 3 Jun 2004 ...
Страница 39: ...page 6 2 G 3 Jun 2004 S C H E M A T I C D R A W I N G S page 6 5 IP 3 4 Inputs Panel Switch Card Load Sheet ...
Страница 40: ...G 3 Jun 2004 page 6 6 ...
Страница 41: ...G 3 Jun 2004 page 6 7 ...
Страница 42: ...G 3 Jun 2004 page 6 8 ...
Страница 43: ...page 6 9 MN 3 Control Panel Switch Card Load Sheet G 3 Jun 2004 ...
Страница 44: ...G 3 Jun 2004 page 6 10 ...
Страница 45: ...G 3 Jun 2004 page 6 11 ...
Страница 46: ...G 3 Jun 2004 page 6 12 ...
Страница 47: ...G 4 Jun 2004 page 6 13 ...
Страница 48: ...page 6 14 HC 3 Host Controller Card Load Sheet G 3 Jun 2004 ...
Страница 49: ...G 3 Jun 2004 page 6 15 ...
Страница 50: ...page 6 16 G 3 Jun 2004 ...
Страница 51: ...page 6 3 G 3 Jun 2004 S C H E M A T I C D R A W I N G S Top page 6 17 VUR 3 Right VU Card Load Sheet Bottom ...
Страница 52: ...G 3 Jun 2004 page 6 18 ...
Страница 53: ...page 6 4 G 3 Jun 2004 S C H E M A T I C D R A W I N G S VUE 3 Extender VU Card Load Sheet page 6 19 Top Bottom ...
Страница 55: ...page 6 5 G 3 Jun 2004 S C H E M A T I C D R A W I N G S G 3 Nov 2005 PSU 1 Power Supply Load Sheet page 6 21 ...