
page 4 – 3
G-3 / Jun 2004
H A R D W A R E
Mixer Link Wiring
This RJ-45 connection provides the control link between the control
surface and the Bridge Router system. All settings and commands gener-
ated on the control surface pass through this link. A special CAT5 cable
wired in “crossover” fashion is used for this link. This special cable
connects the RJ-45 jack on the control surface to the matching RJ-45 jack
on the Bridge Router system. Please note that, in a typical system, there will
be many RJ-45 jacks in the Bridge Router, and for proper operation, the
control surface must be connected to the specific RJ-45 jack defined for it
in the system configuration.
Internal Programming Options
All internal programming options are made via PCB mounted switches.
Switch Settings
SW1 Position 1 - Sample Rate
This dipswitch position must be set to agree with the sample rate of the
system. The switch is off for a sample rate of 44.1kHz and on for a sample
rate of 48kHz.
SW1 Positions 2 and 3 - Not Used
These dipswitch positions are reserved for future use.
SW1 Position 4 - CAT5 Enable
Position 4 of SW1 must be in the on position in order to activate the
CAT5 mixer link connections.
SW2 - CPU Reset
This momentary pushbutton switch allows the host controller to be
reset without powering down the system.
G-3 / Oct 2004
Содержание G-3
Страница 1: ...G 3 Digital Control Surface TECHNICAL MANUAL 600 Industrial Drive New Bern North Carolina USA 28562 ...
Страница 36: ...page 6 2 G 3 Jun 2004 ...
Страница 37: ...page 6 3 G 3 Jun 2004 ...
Страница 38: ...page 6 4 G 3 Jun 2004 ...
Страница 39: ...page 6 2 G 3 Jun 2004 S C H E M A T I C D R A W I N G S page 6 5 IP 3 4 Inputs Panel Switch Card Load Sheet ...
Страница 40: ...G 3 Jun 2004 page 6 6 ...
Страница 41: ...G 3 Jun 2004 page 6 7 ...
Страница 42: ...G 3 Jun 2004 page 6 8 ...
Страница 43: ...page 6 9 MN 3 Control Panel Switch Card Load Sheet G 3 Jun 2004 ...
Страница 44: ...G 3 Jun 2004 page 6 10 ...
Страница 45: ...G 3 Jun 2004 page 6 11 ...
Страница 46: ...G 3 Jun 2004 page 6 12 ...
Страница 47: ...G 4 Jun 2004 page 6 13 ...
Страница 48: ...page 6 14 HC 3 Host Controller Card Load Sheet G 3 Jun 2004 ...
Страница 49: ...G 3 Jun 2004 page 6 15 ...
Страница 50: ...page 6 16 G 3 Jun 2004 ...
Страница 51: ...page 6 3 G 3 Jun 2004 S C H E M A T I C D R A W I N G S Top page 6 17 VUR 3 Right VU Card Load Sheet Bottom ...
Страница 52: ...G 3 Jun 2004 page 6 18 ...
Страница 53: ...page 6 4 G 3 Jun 2004 S C H E M A T I C D R A W I N G S VUE 3 Extender VU Card Load Sheet page 6 19 Top Bottom ...
Страница 55: ...page 6 5 G 3 Jun 2004 S C H E M A T I C D R A W I N G S G 3 Nov 2005 PSU 1 Power Supply Load Sheet page 6 21 ...