![WG Pro-Guard Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/wg/pro-guard/pro-guard_instruction-manual_967068016.webp)
Pro-Guard & Uni-Guard Installation Manual
12
Pipe the power line to where the posts will be mounted. Attach the power cord to the field
connector by following the wiring instructions below.
IMPORTANT NOTICE:
1. Use a torque of 4.5Kg/cm to screw down the wires.
2. The L and N lines can be swapped, but keep all systems wired IDENTICALLY with
respect to the order of the three power lines.
3. If the Pro-Guard shuts down other manufacturers 58Khz deactivators or cause them
to false alarm, or other systems cause the Pro-Guard to shut down or false alarm,
perform the following action:
SWITCH THE “L” AND “N” TERMINAL POSITIONS OF THE POWER CORD AND
THEN TRY SYCHRON ADJUSTMENT (SEE APPENDIX ENTRY B)
4. We recommend using a power cord with a maximum length of 3 meters.
Dig six holes (10mm diameter, 40mm deep) for installing the base.
Black or Brown = Live
White or Blue = Neutral
Green & Yellow = Ground
L GND N
Screw Torque Specification:
4.5Kg/cm
Содержание Pro-Guard
Страница 4: ......