5
WHL-012 REV. 12.17.14
E. WATER QUALITY .................................................................................................................................................................... 10
F. FREEZE PROTECTION ........................................................................................................................................................... 10
PART 3
– TECHNICAL SPECIFICATIONS ............................................................................................................................... 11
PART 4
– PREPARE APPLIANCE LOCATION ........................................................................................................................ 13
A. UNCRATING THE APPLIANCE ............................................................................................................................................... 13
B. BEFORE LOCATING THE APPLIANCE .................................................................................................................................. 14
C. LEVELING ................................................................................................................................................................................ 15
D. CLEARANCES FOR SERVICE ACCESS ................................................................................................................................ 15
E. RESIDENTIAL GARAGE, CLOSET, AND ALCOVE INSTALLATIONS .................................................................................... 16
F. EXHAUST VENT AND INTAKE PIPE ....................................................................................................................................... 16
G. PREVENT COMBUSTION AIR CONTAMINATION ................................................................................................................. 16
H. REMOVING A APPLIANCE FROM A COMMON VENT SYSTEM ........................................................................................... 17
I. WALL-MOUNTING THE APPLIANCE ....................................................................................................................................... 18
J. FLOW RESTRICTOR ................................................................................................................................................................ 18
PART 5
– VENTING ................................................................................................................................................................... 20
A. INTAKE PIPE AND EXHAUST VENT GUIDELINES ................................................................................................................ 20
B. APPROVED VENT MATERIALS .............................................................................................................................................. 21
C. ALLOWED COMBINED VENT LENGTHS ............................................................................................................................... 22
D. TIGHTENING APPLIANCE COLLAR TO EXHAUST VENT AND INTAKE PIPE ..................................................................... 23
E. VENT TERMINATION .............................................................................................................................................................. 24
1. Two Pipe Roof and Sidewall Vent Terminations ..................................................................................................................... 24
2. Direct Vent, Optional Horizontal and Vertical Vent Kits ......................................................................................................... 25
3. Screen Installation ..................................................................................................................................................................... 25
PART 6
– INSTALL THE CONDENSATE DRAIN ..................................................................................................................... 26
PART 7
– GAS PIPING .............................................................................................................................................................. 27
A. GAS PIPE SIZING TABLES ..................................................................................................................................................... 27
1. Gas Pipe Sizing .......................................................................................................................................................................... 27
2. Natural Gas Pipe Sizing ............................................................................................................................................................ 27
3. LP (Liquid Propane) Gas Pipe Sizing ....................................................................................................................................... 28
B. GAS CONNECTION REQUIREMENTS ................................................................................................................................... 28
PART 8
– WATER PIPING ........................................................................................................................................................ 29
A. GENERAL PLUMBING CONNECTION GUIDELINES ............................................................................................................. 29
B. DHW PIPING ............................................................................................................................................................................ 31
C. CENTRAL HEATING PIPING SYSTEM WATER PIPING METHODS ..................................................................................... 31
D. CH AND DHW PRESSURE RELIEF VALVES ......................................................................................................................... 35
PART 9
– CONNECT ELECTRICAL POWER / INITIAL STARTUP ......................................................................................... 35
A. GENERAL OPERATING CONDITIONS ................................................................................................................................... 36
B. WIRING INFORMATION .......................................................................................................................................................... 36
C. DIP SWITCHES ....................................................................................................................................................................... 36
PART 10
– OPERATING SYSTEM INSTRUCTIONS ................................................................................................................ 42
A. CONTROL PANEL ................................................................................................................................................................... 42
Содержание WBRCLP140F
Страница 2: ...2 WHL 012 REV 12 17 14 ...
Страница 38: ...38 WHL 012 REV 12 17 14 Figure 26 Electrical Wiring Diagram ...
Страница 39: ...39 WHL 012 REV 12 17 14 Figure 27 Ladder Diagram ...
Страница 73: ...73 WHL 012 REV 12 17 14 ...
Страница 74: ...74 WHL 012 REV 12 17 14 ...
Страница 75: ...75 WHL 012 REV 12 17 14 MAINTENANCE NOTES ...