30998 R1
53
Figure 40.
Installing the Bearing Mount Plate
Install the Hydraulic Motor and Guards
1. Slide the hydraulic motor assembly (1) onto the drive roller shaft. Ensure that the chain coupler is seated
properly.
Note
Orient sprocket and chain assembly to ensure the sprocket slides onto the shaft.
2. Align the holes on the bearing mount plate and hydraulic motor assembly. Secure both pieces using four
3/8" x 1" bolts (2) and 3/8" locknuts (3).
3. Tighten the bolts on the bearing mount plate.
4. Install the hydraulic drive shields (4) using 5/8" self-tapping screws (5).
Table 30.
Hydraulic Motor and Guards Components
Item
Description
1
Hydraulic Motor Assembly
2
3/8" x 1" Bolt
3
3/8" Locknut
4
Hydraulic Drive Shield
5
#14 x 5/8" Self-tapping Screw with Washerhead
WCX 1335 TOP-DRIVE CONVEYOR – PORTABLE GRAIN BELT CONVEYOR
4. ASSEMBLY