5.2. Pre-Operational Checklist
Before operating auger each time, the operator must confirm the following:
• All fasteners are secure as per assembly instructions.
• Drive belt(s) are not frayed or damaged.
• Drive belt(s) are properly adjusted and aligned.
• Lift cable is not frayed or damaged.
• Lift cable is properly seated in cable sheaves.
• Cable clamps are secure.
• Tube alignment is reasonably straight.
• Auger wheels are chocked.
• Intake area and discharge spout are free of obstructions.
• Proper maintenance has been performed.
• All safety guards are in place and secure.
5.3. Operating Procedure
5.3.1. Start-Up & Break-In
1. Properly place auger and complete the pre-operational checklist at the beginning of
this chapter. If everything is satisfactory, prepare for a 30-minute operation.
2. Correctly position portable grain hopper and secure it to the auger with both straps
(where applicable).
Important:
Anchor and/or support auger during operation. When lower half of auger empties of
grain, the weight balance transfers to the upper end of auger, which can cause
upending.
Do not start auger until area is clear of all unauthorized personnel.
3. Start electric motor, then feed grain to auger.
Important:
When starting auger for the first time, be prepared for an emergency shutdown in case
of excessive vibration or noise. Note that auger may run rough until tube is polished.
4. Upon completion of initial run, shutdown auger. Refer to “Shutdown” on page 52 for
more information.
5. Lock out motor and conduct a complete inspection of auger following the checklist at
the beginning of this chapter.
After the initial start-up and inspection, the auger should be shut down and inspected at
least three more times during the first 10 hours of operation.
Keep operation of empty auger to a minimum, as this results in excessive wear.
Once auger is broken in, the checklist should be a part of the daily routine before
operating auger.