3. A
SSEMBLY
W
ESTFIELD
- G
RAIN
A
UGERS
3.4. B
EFORE
Y
OU
B
EGIN
WR 60/80/100 X 26’ - 71’ EMD M
ODEL
18
30255 R3
• 6-10 wood blocks (2x4's or smaller)
• Grease
• Impact wrench and sockets
• 2+ steel punches (for aligning bolt holes)
3.4. Before You Begin
• Perform assembly on a firm and level surface in an area large enough to allow
access to all sides of the equipment.
• Before beginning assembly, familiarize yourself with all the sub-assemblies, compo-
nents, and hardware that make up the equipment.
• Have all parts and components on hand, and arrange them for easy access.
• Separate the hardware (bolts, nuts, etc.) and lay them out into groups for easier
identification during assembly.
Note:
When options or more than one configuration is available for the equipment and the
assembly information varies, additional instructions will be included.
These additional instructions will be indicated with an arrow.
• If assembling inside a building, be sure the ceiling is at least 14’ (4.27 m) high to pro-
vide clearance when installing the undercarriage.
• Ensure there is adequate space to remove the assembled machine from the assem-
bly area.
3.5. Tubes & Flighting
The 26’ model has only one flighting and tube section and does not require assembly.
1. Position tube sections. Align tube sections on a flat surface or on a series of
benches.
Do not drop. Damage to equipment or serious personal injury will
result.
Note:
When assembling more than 2 sections, start from spout end and work towards hopper.
2. Screw or slide lower flight shaft onto upper flight shaft until flight ends butt together
and flighting spiral matches up. Secure with hardware listed in table below. Repeat,
if necessary, for any remaining flight shafts.