W
ESTFIELD
- G
RAIN
A
UGERS
3. A
SSEMBLY
WR 60/80/100 X 26’ - 71’ EMD M
ODEL
3.11. U
PPER
H
OUSING
L
UBRICATION
30255 R3
27
3.11. Upper Housing Lubrication
Fill enclosed upper drive housing with grease.
For continuous use in extreme cold conditions, semi-fluid arctic grease or heavy oil may
be used.
Table 3.3 Driveshaft Shielding Sequence
Auger Size/
Length
Step 1
Step 2
Step 3
Step 4
Qty
Length
Qty
Length
Qty
Length
Qty
Length
6”/8” x 26’
1
24”
(0.61 m)
1
42”
(1.07 m)
2
48”
(1.22 m)
1
42"
(1.07 m)
6”/8” x 31’
1
24”
(0.61 m)
1
42”
(1.07 m)
3
48”
(1.22 m)
1
42"
(1.07 m)
10" x 31’
1
42”
(1.07 m)
5
48”
(1.22 m)
1
42”
(1.07 m)
--
--
6”/8” x 36’
1
48”
(1.22 m)
1
42”
(1.07 m)
4
48”
(1.22 m)
1
42"
(1.07 m)
6”/8” x 41’
2
48”
(1.22 m)
1
42”
(1.07 m)
4
48”
(1.22 m)
1
42"
(1.07 m)
10" x 41’
1
24”
(0.61 m)
2
42”
(1.07 m)
5
48”
(1.22 m)
1
42"
(1.07 m)
8" x 46’
3
42”
(1.07 m)
4
60”
(1.52 m)
1
48”
(1.22 m)
--
--
6”/8” x 51’
1
48”
(1.22 m)
6
60”
(1.52 m)
1
48”
(1.22 m)
--
--
6" x 61’
1
48”
(1.22 m)
7
60”
(1.52 m)
1
48”
(1.22 m)
--
--
10" x 51’
1
24”
(0.61 m)
8
48”
(1.22 m)
1
42”
(1.07 m)
--
--
8" x 56’
10
48”
(1.22 m)
1
42”
(1.07 m)
--
--
--
--
8”/10” x 61’
1
24”
(0.61 m)
10
48”
(1.22 m)
1
42”
(1.07 m)
--
--
8”/10” x 71’
1
42”
(1.07 m)
12
48”
(1.22 m)
1
42”
(1.07 m)
--
--
WR60
550 g
20 oz
WR80 x 26' - 51'
750 g
26 oz
WR80 x 56' - 71'
900 g
32 oz
WR100
1100 g
40 oz