PRESSURE RELIEF VALVE - ASSEMBLY
E -
Insert the pressure relief valve body in the pressure relief valve hole.
F -
Position the new pressure relief valve in its seat, tighten with your hands and then with the tool.
G -
Refit the inflation valve in its seat.
H -
Now inflate the tube until it is not cylindrical (the internal pressure must be low). Tighten the valves with the specific
tools, inflate again by slightly increasing the pressure and tighten again. Repeat this operation several times, increasing the
pressure each time. Then inflate the tube at the working pressure and tighten the valve one last time.
Содержание AIRFRAME SENTINEL II
Страница 1: ...Inflatable Shelter TECHNICAL MANUAL HEAVY DUTY INFLATABLE SHELTER SYSTEM P N SW SII 2015...
Страница 2: ...D P...
Страница 8: ...ILLUSTRATED PROCEDURE FOR SHELTER DEPLOYMENT...
Страница 9: ......
Страница 10: ......
Страница 12: ...ILLUSTRATED PROCEDUREFOR SHELTER INFLATION...
Страница 15: ...1 2 3 4 Figure 2 10 Assembly sequence of inner insulating liner for TAG NG 4 arches tent...
Страница 17: ...Figure 2 12 Installed sunshade diagram Figure 2 13 Noose and knot on guy rod diagram at...