Figure 2.5 - Unblocking spacer rod clamp.
Figure 2.6 - Spacer rod engagement by means of union joint.
Figure 2.7 - Spacer rod (PURLIN) installed.
Part
Component
Q.ty x tent
3A
4A
5A
1
Cross-shaped stakes
18
22
26
2
Guy lines L=16'4''
4
4
4
3
Base braids L=3'3''
14
18
22
4
Guy lines L=16'4'' (optional)
2
4
6
Figure 2.8 - Stake and guy line arrangement for TAG NG 4 arches tent.
Содержание AIRFRAME SENTINEL II
Страница 1: ...Inflatable Shelter TECHNICAL MANUAL HEAVY DUTY INFLATABLE SHELTER SYSTEM P N SW SII 2015...
Страница 2: ...D P...
Страница 8: ...ILLUSTRATED PROCEDURE FOR SHELTER DEPLOYMENT...
Страница 9: ......
Страница 10: ......
Страница 12: ...ILLUSTRATED PROCEDUREFOR SHELTER INFLATION...
Страница 15: ...1 2 3 4 Figure 2 10 Assembly sequence of inner insulating liner for TAG NG 4 arches tent...
Страница 17: ...Figure 2 12 Installed sunshade diagram Figure 2 13 Noose and knot on guy rod diagram at...