Test arch integrity as follows:
-
Take the arch to working pressure (4.35 psi).
-
Check and restore initial pressure if required after one hour.
-
After four hours, check that the pressure has not dropped to less than 4.06 psi. Otherwise, proceed as shown in step
4.2.
E -
Clean and wash the accessories.
F -
Fold as shown in section 3.
NOTE:
WELDING REPAIRS MUST BE PERFORMED BY THE MANUFACTURER.