
Installation and operating instruction
Dual fuel burner WGL30/1-C ZM
7 Commissioning
83260202 1/2019-02 La
59-144
Full load
[kW]
Setting pres-
sure
into gas butter-
fly valve
[mbar]
Min. connection pressure into isolating valve
[mbar]
(low pressure supply)
Nominal diameter valve train
¾"
¾"
1"
1½"
Multifunction assembly W-MF
SE
507
507
512
512
Isolating valve
¾"
1"
1"
1½"
Liquid Petroleum Gas: H
i
= 25.89 kWh/m
3
, d = 1.555
The selection is calculated for Propane, it can however, also be used
for Butane.
125
9.1
11
11
11
11
145
9.3
12
12
11
11
165
9.5
12
12
12
11
185
9.7
13
13
12
12
200
9.8
13
13
12
12
220
10.0
14
13
13
12
240
10.2
15
14
13
13
260
10.4
16
14
13
13
280
10.6
16
15
14
13
300
10.8
17
16
14
14
320
11.0
18
16
15
14
340
11.1
19
17
15
14
(1
Not TRGI compliant.
Preset setting pressure
Only in conjunction with W-MF and gas connection pressure > 150 mbar
The pre-pressure must be set to approx. 90 mbar.
Set FRS pressure regulator, see additional sheet (print No. 835109xx).
Preset setting pressure determined at multifunction assembly.
Содержание WGL30/1-C ZM
Страница 1: ...Installation and operating instruction Dual fuel burner WGL30 1 C ZM 83260202 1 2019 02 ...
Страница 121: ...Installation and operating instruction Dual fuel burner WGL30 1 C ZM 12 Project planning 83260202 1 2019 02 La 121 144 ...
Страница 138: ...Installation and operating instruction Dual fuel burner WGL30 1 C ZM 14 Notes 83260202 1 2019 02 La 138 144 14 Notes ...
Страница 139: ...Installation and operating instruction Dual fuel burner WGL30 1 C ZM 14 Notes 83260202 1 2019 02 La 139 144 ...
Страница 143: ...83260202 1 2019 02 La ...