
Installation and operating instruction
Dual fuel burner WGL30/1-C ZM
6 Operation
83260202 1/2019-02 La
49-144
6.3 Linearisation
During commissioning it is possible to carry out linearisation of the operating points
in gas operation.
During linearisation a straight line is generated from the operating point displayed
to P9. The values on the straight are adopted as the new operating points.
Initiate a calculation after P9
Press [ENTER].
Combustion manager changes to linearisation mode.
The linearisation mode can be interrupted using the [-] key.
Confirm with [+] key.
Linearisation is initiated.
Example:
P1
P2
P3
P4
P5
P6
P7
P8
P9
P1
P2
P3
P4
P5
P6
P7
P8
P9
1
2
1
Calculation from P1 to P9
2
Calculation from P5 to P9
Содержание WGL30/1-C ZM
Страница 1: ...Installation and operating instruction Dual fuel burner WGL30 1 C ZM 83260202 1 2019 02 ...
Страница 121: ...Installation and operating instruction Dual fuel burner WGL30 1 C ZM 12 Project planning 83260202 1 2019 02 La 121 144 ...
Страница 138: ...Installation and operating instruction Dual fuel burner WGL30 1 C ZM 14 Notes 83260202 1 2019 02 La 138 144 14 Notes ...
Страница 139: ...Installation and operating instruction Dual fuel burner WGL30 1 C ZM 14 Notes 83260202 1 2019 02 La 139 144 ...
Страница 143: ...83260202 1 2019 02 La ...