![Weishaupt WG20-/1-C LN Series Скачать руководство пользователя страница 46](http://html.mh-extra.com/html/weishaupt/wg20-1-c-ln-series/wg20-1-c-ln-series_manual_953381046.webp)
Installation and operating instruction
Gas burner WG20…/1-C LN
7 Commissioning
83240802 1/2020-01 La
46-96
7.4 Concluding work
Check control and safety devices.
Remove gas pressure measuring devices and close all test points.
Conclude valve proving of gas valve train (fourth test phase) [ch. 7.1.3].
Enter combustion values and settings in the commissioning record and/or test
sheet.
Mount cover on burner.
Inform the operator about the use of the equipment.
Hand the installation and operating manual to the operator and inform him that
this should be kept with the appliance.
Point out to operator that the installation should be serviced annually.
Содержание WG20-/1-C LN Series
Страница 1: ...Installation and operating instruction Gas burner WG20 1 C LN 83240802 1 2020 01 ...
Страница 90: ...Installation and operating instruction Gas burner WG20 1 C LN 14 Notes 83240802 1 2020 01 La 90 96 14 Notes ...
Страница 91: ...Installation and operating instruction Gas burner WG20 1 C LN 14 Notes 83240802 1 2020 01 La 91 96 ...
Страница 92: ...Installation and operating instruction Gas burner WG20 1 C LN 14 Notes 83240802 1 2020 01 La 92 96 ...
Страница 95: ...83240802 1 2020 01 La ...