![Weishaupt WG20-/1-C LN Series Скачать руководство пользователя страница 33](http://html.mh-extra.com/html/weishaupt/wg20-1-c-ln-series/wg20-1-c-ln-series_manual_953381033.webp)
Installation and operating instruction
Gas burner WG20…/1-C LN
7 Commissioning
83240802 1/2020-01 La
33-96
Third test phase
In the third phase the valve train section from the multifunction assembly up to the
gas butterfly valve is tested.
Remove mixing head [ch. 9.3].
Fit blanking plate
4
.
Fit mixing head.
Connect test equipment.
Carry out test to table.
Close all test points.
Remove blanking plate.
2
4
1
3
1
First test phase
2
Second test phase
3
Third test phase
4
Blanking plate
Fourth test phase
In the fourth test phase, the joint to the mixing head
1
is tested for soundness. The
test phase can only be carried out during or after burner commissioning.
A leak detecting spray or electronic gas detector should be used for testing.
1
Use only leak detecting foam solutions, which do not cause corrosion, see DVGW-
TRGI, worksheet G 600.
Check all components, intersections and test points of the gas valve train
between multifunction assembly and burner.
Document result of the soundness test on the engineers report.
Содержание WG20-/1-C LN Series
Страница 1: ...Installation and operating instruction Gas burner WG20 1 C LN 83240802 1 2020 01 ...
Страница 90: ...Installation and operating instruction Gas burner WG20 1 C LN 14 Notes 83240802 1 2020 01 La 90 96 14 Notes ...
Страница 91: ...Installation and operating instruction Gas burner WG20 1 C LN 14 Notes 83240802 1 2020 01 La 91 96 ...
Страница 92: ...Installation and operating instruction Gas burner WG20 1 C LN 14 Notes 83240802 1 2020 01 La 92 96 ...
Страница 95: ...83240802 1 2020 01 La ...