6
ASSEMBLY
• Assembly requires two persons.
• Due to its weight and size, the weight bench
should be assembled in the location where it will
be used. Make sure that there is enough clear-
ance to walk around the weight bench as you
assemble it.
• Place all parts in a cleared area and remove the
packing materials. Do not dispose of the packing
materials until you
nish all assembly steps.
• Left parts are marked “L” or “Left” and right parts
are marked “R” or “Right.”
• To identify small parts, see page 5.
• In addition to the included tool(s), assembly
requires the following tool(s):
two adjustable wrenches
one Phillips screwdriver
Assembly may be easier if you have a set of
wrenches. To avoid damaging parts, do not use
power tools.
1.
Go to www.weiderservice.com/registration on
your computer and register your product.
• activates your warranty
• saves you time if you ever need to contact
Customer Care
• allows us to notify you of upgrades and offers
Note: If you do not have Internet access, call
1-877-992-5999 and register your product.
1
The Three Stages of the Assembly Process
Frame Assembly
—You will begin by assembling
the bases and the uprights that form the skeleton of
the weight bench.
Cable Assembly
—During this stage you will attach
the cables and pulleys that connect the weight
carriage to the frame.
VKR Assembly
—During this stage you will
assemble the VKR frame and pads.
Содержание 831.14933.0
Страница 20: ...20 NOTES...