21
54. Wrap the Ab Cable (66) over a 100mm Pulley
(38). Attach the Pulley and a Long Cable Trap
(68) to the indicated hole in the indicated “U”-
bracket (40) with an M10 x 50mm Bolt (81) and
an M10 Nylon Locknut (101). Make sure the
Cable Trap is oriented to hold the Cable in the
groove of the Pulley.
55. Wrap the Ab Cable (66) under a 100mm Pulley
(38). Attach the Pulley to the Butterfly Upright (2)
with an M10 x 45mm Bolt (51) and an M10 Nylon
Locknut (101).
54
55
56
53
53. Wrap the Ab Cable (66) under a 100mm Pulley
(38). Attach the Pulley and a Long Cable Trap
(68) to the Butterfly Upright (2) with an M10 x
50mm Bolt (81) and an M10 Nylon Locknut (101).
Make sure the Cable Trap is oriented to hold
the Cable in the groove of the Pulley.
56. Route the Ab Cable (66) over a 100mm Pulley
(38) and through the Butterfly Upright (2). Attach
the Pulley inside the Upright with an M10 x 65mm
Bolt (80), two M10 Washers (99), two 12.5mm
Spacers (69), and an M10 Nylon Locknut (101).
66
68
68
66
51
38
2
38
40
81
101
101
101
66
99
99
101
69
69
66
2
38
2
81
38
80