14
20. Route the Lat Cable (62) up through the Top
Frame (9), over a 100mm Pulley (38), and back
down through the Top Frame. Attach the Pulley
inside the Top Frame with an M10 x 65mm Bolt
(80), two M10 Washers (99), two 12.5mm
Spacers (69), and an M10 Nylon Locknut (101).
21. Wrap the Lat Cable (62) under a 100mm Pulley
(38). Attach the Pulley to the Double “U”-bracket
(42) with an M10 x 45mm Bolt (51) and an M10
Nylon Locknut (101).
23. Route the Lat Cable (62) over a 100mm Pulley
(38) and down through the Top Frame (9). Attach
the Pulley inside the Top Frame with an M10 x
65mm Bolt (80), two M10 Washers (99), two
12.5mm Spacers (69), and an M10 Nylon Locknut
(101).
24. Set the tether on a Weight Pin (98) over the Long
Weight Tube (23). Set a 50mm Washer (95) on
the Weight Tube.
Thread an M12 Nut (58) all the way onto the Lat
Cable (62). Screw the Cable partway into the
Long Weight Tube (23). Tighten the Nut against
the 50mm Washer (95).
22. Route the Lat Cable (62) up through the Top
Frame (9) and over a 100mm Pulley (38). Attach
the Pulley inside the Top Frame with an M10 x
65mm Bolt (80), two M10 Washers (99), two
12.5mm Spacers (69), and an M10 Nylon Locknut
(101).
20
22
21
23
24
38
62
80
80
51
99
99
101
69
69
9
9
99
101
101
69
99
80
99
69
99
9
101
69
38
38
42
62
38
62
62
98
58
23
95
62
69