20
34.
See the CABLE DIAGRAM on page 34 to iden-
tify the cables as you assemble them.
Identify the Arm Cable (145).
Grease an M8 x
22mm Shoulder Bolt (143). Attach the Cable to
the Left Adjustment Bracket (25) with the
Shoulder Bolt and an M8 Nylon Locknut (170).
Make sure that the flat edge of the cable is
against the Adjustment Bracket. Do not over-
tighten the Shoulder Bolt; the Cable must
pivot easily.
36. Wrap the Arm Cable (145) under a Small Pulley
(74). Attach the Small Pulley and two Half Pulley
Guards (91) to the Double “U”-bracket (98) with
an M10 x 45mm Bolt (140) and an M10 Nylon
Locknut (153).
Make sure that the Half Pulley
Guards are oriented as shown.
35.
Identify the two “V”-pulleys (75), which are
wider than the other pulleys.
Wrap the Arm
Cable (145) over a “V”-pulley. Attach the “V”-pul-
ley, a Large Cable Trap (77), and two Full Pulley
Guards (76) to the indicated bracket on the
Center Upright (13) with an M10 x 60mm Bolt
(133) and an M10 Nylon Locknut (153).
Make
sure that the Cable Trap is oriented to hold
the Cable in the groove of the “V”-pulley.
36
25
75
76
133
77
153
76
13
91
91
98
153
140
145
74
145
Grease
34
25
145
170
145
143
170
143
35